Planning tools resulting from IN2SMART2 work packages 10, 12 and 15

Work package 10 - Operational decision support

Level: Operational

Task: Preparation of a shift plan for tamping activities based on the condition prediction for 25 m long sections.

Link to the planning tool

Work package 12 - Condition-based planning of lean tamping activities

Level: Operational

Task: Develop a lean tamping plan based on the predicted track condition, such that defined network quality is ensured, and the available budget is met.

Link to the planning tool

Work package 15 - Strategical asset management tool for the North Line in Portugal

Level: Strategic (based on simulated tactical planning)

Task: Support strategic planning decisions by simulating and evaluating the tactical planning process over a rolling time horizon in different scenarios.

Link to the planning tool